Flowmatic FMR04-ZW User Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
Installation of Storage Tank
Apply Teflon tape in a clockwise direction around the
male pipe threads on the tank.
Thread the ball valve (supplied in the parts bag)
onto the stainless steel connector on the tank.
Note: Do not over tighten plastics connections.
Step 17 Thread 1/4 plastic connector fitting (supplied in the
parts bag) into the ball valve attached to the tank.
Connecting the Tank
Step 18 Postion the tank in the desired location. Stand it
upright or using black plastic stand lay it on its side. Connect
remaining blue tube from he RO module
over to the tank ball valve connector.
Step 19 Push blue tube into the connector on the
end of ball valve until it stops. Use a wrench
to securely tighten the nut on the connector.
Step 15
Step 16
7
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 15 16

Comments to this Manuals

No comments